Storage Period
7 storage months (16.09.2026 - 31.03.2027)
Working Gas Volume
42 350 378 kWh
Max. Injection Output
617 972 kWh/day
Max. Withdrawal Output
766 542 kWh/day
Max. filling time of 90 % of capacity
15.12.2026 (90 days)
22.3.2023 | (2657x)
Auction Date: 29 March 2023, 10 a.m. (CEST)
Type of storage capacity reserved: Monthly storage capacity - only the fixed withdrawal output
Withdrawal output: 5 000 MWh/day
Storage period: from 1 April 2023, 6 a.m., and ending on 1 April 2024, 6 a.m.
For additional information please contact: auction@mnd-es.cz
Josef Brůček Tel.: +420 775 877 182
auction-terms-withdrawal-rate-29032023.pdf (305 KB)
sample-storage-contract-wihdrawal-rate.pdf (225 KB)