CURRENT

Operational information

Total available withdrawal and injection capacities
From
To

Values in the table are only indicative.

Date Total available withdrawal capacity (MWh/day) Total available injection capacity (MWh/day)
12.7.2024 88 207 29 328
11.7.2024 88 207 29 328
10.7.2024 88 207 29 328
9.7.2024 88 206 29 372
8.7.2024 93 206 39 394
7.7.2024 93 211 39 394
6.7.2024 93 211 39 394
5.7.2024 93 206 39 394
4.7.2024 93 206 39 395
Total contracted withdrawal and injection capacities
From
To

Values in the table are only indicative.

Date Total contractual withdrawal capacity (MWh/day) Total contractual injection capacity (MWh/day)
12.7.2024 73 211 29 328
11.7.2024 73 211 29 328
10.7.2024 73 211 29 328
9.7.2024 73 211 29 372
8.7.2024 73 211 29 372
7.7.2024 73 211 29 372
6.7.2024 73 211 29 372
5.7.2024 73 211 29 372
4.7.2024 73 211 29 373
Interrupted interruptible capacity and price
From
To
Date Withdrawals (MWh/day) Injections (MWh/day) Price
11.7.2024 0 0 0
Size of interrupted firm storage capacity
From
To
Date Withdrawals (MWh/day) Injections (MWh/day)
11.7.2024 0 0
Actual stock level and daily values of injection and withdrawal
From
To
Date Current capacity in MWh Withdrawals (MWh/day) Injections (MWh/day)
11.7.2024 3 387 707 4 8 950
Storage capacity
Year Total technical capacity (GWh) Contracted capacity (GWh)  Free capacity (GWh)
2024/25 3,630 3,630 0
2025/26 3,630 3,484.4 145.6
2026/27 3,630 3,082 548
Storage Development – Capacity and Outputs
 Storage Year  Working Gas Volume [GWh] Max. contractual withdrawals [GWh/day] Max. contractual injections [GWh/day]
 
2029 3,650 98 60
2028 3,650 98 60
2027 3,650 98 60
2026 3,630 98 60
2025 3,630 98 60
2024 3,630 98 60
2023 3,696 98 60
2022 3,420 96 59
2021 3,420 107 59
Shutdowns and maintenance
Shutdown date  Reduction in daily storage during the shutdown in %  Type of shutdown Note 
   Daily injections Daily withdrawals   
14.5. 06:00 - 17.5. 06:00 2024 100% 100% planned Maintenance at MS Brumovice
9.9. 06:00 - 23.9. 06:00 2024 100% 100% planned Regular maintenance at UGS Uhřice
11.9. 06:00 - 24.9. 06:00 2023 100% 100% planned Regular maintenance at UGS Uhřice
12. 9. – 25. 9. 2022 100% 100% planned Regular maintenance at UGS Uhřice
13.9 - 26.9.2021  100% 100% planned Regular maintenance at UGS Uhřice
30. - 31.8.2021 100% 100% planned Maintenance at MS Brumovice – testing of alarm/shutdown sequences
14. – 22. 9. 2020 100% 100% planned Limitation caused by TSO (Net4Gas), repair works of pipeline DN 700 RU Mutěnice – TU Diváky
14.9. – 27.9.2020 100% 100% planned Regular maintenance at UGS Uhřice
3.6. – 16.6.2019 100% 100% planned Regular maintenance at UGS Uhřice
30.10.2018, 1.11.2018 50% 50% planned Limitation caused by N4G (cleaning of pipeline DN 700 RU Mutěnice – PRS V.Němčice)
13.9.2018, 20.9.2018 17% 17% planned Limitation caused by N4G (cleaning of pipeline DN 700 RU Mutěnice – PRS V.Němčice)
10.9.2018 – 23.9.2018 100% 100% planned Regular maintenance at UGS Uhřice
30.10.2017 – 12.11.2017 100% 100% planned Maintenance at MS Brumovice
Available daily firm/interruptible capacity
Date Daily Firm Rate Daily Interruptible Rate
Injection Withdrawal Injection Withdrawal
12.7.2024 N/A N/A 0 -9 995 610
13.7.2024 0 -5 000 000 0 -9 995 570
14.7.2024 0 -5 000 000 0 -10 000 010