Date Total available withdrawal capacity (MWh/day) Total available injection capacity (MWh/day)
2.10.2023 75 894 28 836
1.10.2023 75 894 28 836
30.9.2023 75 834 28 836
29.9.2023 75 834 28 836
28.9.2023 75 834 28 836
27.9.2023 75 834 28 836
26.9.2023 75 834 28 836
25.9.2023 75 834 28 836
Size of contractual withdrawals and injections
From
To

Values in the table are only indicative.

Date Total contractual withdrawal capacity (MWh/day) Total contractual injection capacity (MWh/day)
2.10.2023 75 894 28 836
1.10.2023 75 894 28 836
30.9.2023 75 834 28 836
29.9.2023 75 834 28 836
28.9.2023 75 834 28 836
27.9.2023 75 834 28 836
26.9.2023 75 834 28 836
25.9.2023 75 834 28 836
Interrupted interruptible capacity and price
Date Withdrawals (MWh/day) Injections (MWh/day) Price
1.10.2023 0 0 0
Size of interrupted firm storage capacity
Date Withdrawals (MWh/day) Injections (MWh/day)
1.10.2023 0 0
Current capacity in the virtual storage facility and actual daily injection and withdrawal values
Date Current capacity in MWh Withdrawals (MWh/day) Injections (MWh/day)
1.10.2023 3 501 158 0 14 343
Storage capacity
Year Total technical capacity (GWh) Contracted capacity (GWh)  Free capacity (GWh)
2022/23 3 420 3 420 0
2023/24 3 696 3 696 0
2024/25 3 530 3 220 310
Storage Development – Capacity and Outputs
 Storage Year  Working Gas Volume [GWh] Max. contractual withdrawals [GWh/day] Max. contractual injections [GWh/day]
 
2028 3 650 96 59
2027 3 650 96 59
2026 3 610 96 59
2025 3 570 96 59
2024 3 530 96 59
2023 3 696 96 59
2022 3 420 96 59
2021 3 420 107 59
2020 3 420 115 64
Shutdowns and maintenance
Shutdown date  Reduction in daily storage during the shutdown in %  Type of shutdown Note 
   Daily injections Daily withdrawals   
11.9. 06:00 - 24.9. 06:00 2023 100% 100% planned Regular maintenance at UGS Uhřice
12. 9. – 25. 9. 2022 100% 100% planned Regular maintenance at UGS Uhřice
13.9 - 26.9.2021  100% 100% planned Regular maintenance at UGS Uhřice
30. - 31.8.2021 100% 100% planned Maintenance at MS Brumovice – testing of alarm/shutdown sequences
14. – 22. 9. 2020 100% 100% planned Limitation caused by TSO (Net4Gas), repair works of pipeline DN 700 RU Mutěnice – TU Diváky
14.9. – 27.9.2020 100% 100% planned Regular maintenance at UGS Uhřice
3.6. – 16.6.2019 100% 100% planned Regular maintenance at UGS Uhřice
30.10.2018, 1.11.2018 50% 50% planned Limitation caused by N4G (cleaning of pipeline DN 700 RU Mutěnice – PRS V.Němčice)
13.9.2018, 20.9.2018 17% 17% planned Limitation caused by N4G (cleaning of pipeline DN 700 RU Mutěnice – PRS V.Němčice)
10.9.2018 – 23.9.2018 100% 100% planned Regular maintenance at UGS Uhřice
30.10.2017 – 12.11.2017 100% 100% planned Maintenance at MS Brumovice
Available daily firm/interruptible capacity
Date Daily Firm Rate Daily Interruptible Rate
Injection Withdrawal Injection Withdrawal
2.10.2023 N/A N/A 0 -9 990 010
3.10.2023 0 -4 940 000 0 -10 000 010
4.10.2023 0 -4 940 000 0 -10 000 010