Storage Period

8 storage months (25 August 2026 - 31 March 2027)

Working Gas Volume

50 000 MWh

Interruptible Injection Output - flat

1 687 MWh/day

Interruptible Withdrawal Output - flat

1 667 MWh/day

20.3.2024 | (3685x)

Storage Capacity Auction - only Withdrawal Output 25 March 2024

Auction Date: 25 March 2024, 2 p.m. (CET)

Type of storage capacity reserved: Monthly storage capacity - only the fixed withdrawal output

Withdrawal output: 4 000 MWh/day

Storage period: from 1 April 2024, 6 a.m., and ending on 1 April 2025, 6 a.m.

 

For additional information please contact: auction@mnd-es.cz
Josef Brůček Tel.: +420 775 877 182
Filip Červenka Tel.: +420 775 875 092

Auction Terms - Withdrawal Rate
Sample Storage Contract - Withdrawal Rate