Storage Period

7 storage months (16.09.2026 - 31.03.2027)

Working Gas Volume

42 350 378 kWh

Max. Injection Output

617 972 kWh/day

Max. Withdrawal Output

766 542 kWh/day

Max. filling time of 90 % of capacity

15.12.2026 (90 days)

14.4.2023 | (2641x)

Storage Capacity Auction 19 April 2023

Auction Date: 19 April 2023, 10 a.m. (CEST)

Type of storage capacity reserved: Monthly storage capacity with the fixed output

Storage Capacity: 55 000 MWh

Injection output (flat): 612 MWh/day

Withdrawal output (flat): 917 MWh/day

Storage period: from 1 April 2023, 6 a.m., and ending on 1 April 2024, 6 a.m.

 

For additional information please contact: auction@mnd-es.cz
Josef Brůček Tel.: +420 775 877 182

 

sample-storage-contract.pdf (230 KB)