Storage Period
3 storage years (01.04.2027 - 31.03.2030)
Working Gas Volume
500 000 MWh
Injection Output
7 310 MWh/day
Withdrawal Output
7 040 MWh/day
14.4.2023 | (2475x)
Auction Date: 19 April 2023, 10 a.m. (CEST)
Type of storage capacity reserved: Monthly storage capacity with the fixed output
Storage Capacity: 55 000 MWh
Injection output (flat): 612 MWh/day
Withdrawal output (flat): 917 MWh/day
Storage period: from 1 April 2023, 6 a.m., and ending on 1 April 2024, 6 a.m.
For additional information please contact: auction@mnd-es.cz
Josef Brůček Tel.: +420 775 877 182
sample-storage-contract.pdf (230 KB)