CURRENT

Operational information

Total available withdrawal and injection capacities
From
To

Values in the table are only indicative.

Date Total available withdrawal capacity (MWh/day) Total available injection capacity (MWh/day)
29.10.2026 89 371 40 785
28.10.2026 89 785 40 785
27.10.2026 89 685 40 785
26.10.2026 89 685 40 718
25.10.2026 89 935 40 718
24.10.2026 89 935 40 763
23.10.2026 89 935 40 673
22.10.2026 89 935 40 673
21.10.2026 89 935 40 673
Total contracted withdrawal and injection capacities
From
To

Values in the table are only indicative.

Date Total contractual withdrawal capacity (MWh/day) Total contractual injection capacity (MWh/day)
29.10.2026 74 935 30 785
28.10.2026 74 935 30 785
27.10.2026 74 935 30 785
26.10.2026 74 935 30 718
25.10.2026 74 935 30 718
24.10.2026 74 935 30 763
23.10.2026 74 935 30 673
22.10.2026 74 935 30 673
21.10.2026 74 935 30 673
Interrupted interruptible capacity and price
From
To
Date Withdrawals (MWh/day) Injections (MWh/day) Price
28.10.2026 0 0 0
Size of interrupted firm storage capacity
From
To
Date Withdrawals (MWh/day) Injections (MWh/day)
28.10.2026 0 0
Actual stock level and daily values of injection and withdrawal
From
To
Date Current capacity in MWh Withdrawals (MWh/day) Injections (MWh/day)
28.10.2026 3 290 631 7 276 21 049
Storage capacity
Year Total technical capacity (GWh) Contracted capacity (GWh)  Free capacity (GWh)
2026/27 3,707 3,707 0
2027/28 3,705 3,300 405
2028/29 3,760 550 3,210
Storage Development – Capacity and Outputs
 Storage Year  Working Gas Volume [GWh] Max. contractual withdrawals [GWh/day] Max. contractual injections [GWh/day]
 
2030 3,760 99 61
2029 3,760 99 61
2028 3,760 99 61
2027 3,705 99 61
2026 3,705 99 61
2025 3,705 99 61
2024 3,705 98 60
2023 3,696 98 60
2022 3,420 96 59
2021 3,420 107 59
Shutdowns and maintenance
Shutdown date  Reduction in daily storage during the shutdown in %  Type of shutdown Note 
   Daily injections Daily withdrawals   
31.05. 06:00 - 19.06 06:00 2027 100% 100% planned Coordinated outage of NET4GAS and MND Energy Storage
27.05. 06:00 - 10.06. 06:00 2026 100% 100% planned Regular maintenance at UGS Uhřice (incl. methane emissions reduction operations)
13.9. 06:00 - 27.9. 06:00 2025 100% 100% planned Regular maintenance at UGS Uhřice
13.5. 06:00 - 16.5. 06:00 2025 100% 100% planned Maintenance at MS Brumovice
9.9. 06:00 - 21.9. 06:00 2024 100% 100% planned Regular maintenance at UGS Uhřice
14.5. 06:00 - 17.5. 06:00 2024 100% 100% planned Maintenance at MS Brumovice
11.9. 06:00 - 24.9. 06:00 2023 100% 100% planned Regular maintenance at UGS Uhřice
12. 9. – 25. 9. 2022 100% 100% planned Regular maintenance at UGS Uhřice
13.9 - 26.9.2021  100% 100% planned Regular maintenance at UGS Uhřice
30. - 31.8.2021 100% 100% planned Maintenance at MS Brumovice – testing of alarm/shutdown sequences
14. – 22. 9. 2020 100% 100% planned Limitation caused by TSO (Net4Gas), repair works of pipeline DN 700 RU Mutěnice – TU Diváky
14.9. – 27.9.2020 100% 100% planned Regular maintenance at UGS Uhřice
3.6. – 16.6.2019 100% 100% planned Regular maintenance at UGS Uhřice
30.10.2018, 1.11.2018 50% 50% planned Limitation caused by N4G (cleaning of pipeline DN 700 RU Mutěnice – PRS V.Němčice)
13.9.2018, 20.9.2018 17% 17% planned Limitation caused by N4G (cleaning of pipeline DN 700 RU Mutěnice – PRS V.Němčice)
10.9.2018 – 23.9.2018 100% 100% planned Regular maintenance at UGS Uhřice
30.10.2017 – 12.11.2017 100% 100% planned Maintenance at MS Brumovice
Available daily firm/interruptible capacity
Date Daily Firm Rate Daily Interruptible Rate
Injection Withdrawal Injection Withdrawal
29.10.2026 N/A N/A 5 000 000 -9 436 000
30.10.2026 5 000 000 -5 000 000 5 000 000 -10 000 000
31.10.2026 5 000 000 -5 000 000 5 000 000 -10 000 000