Storage period
12 storage months (1 October 2026 – 30 September 2027)
Working gas volume
50 000 MWh
Injection output (flat)
556 MWh/day
Withdrawal output (flat)
834 MWh/day
Gas lease
50 000 MWh
20.3.2026 | (99x)
Type of storage capacity reserved: Monthly storage capacity with the interruptible output and Gas Lease
Auction Date: 23 March 2026, 14:00
Type of auction: ERMMA
Working Gas Volume: 50 000 MWh
Size of additional storage capacity: 0 %
Injection Output (flat): 556 MWh/day (90 days)
Withdrawal Output (flat): 834 MWh/day (60 days)
Gas Lease: 50 000 MWh
Storage period: 12 storage months from 1 October 2026, 6 a.m., and ending on 1 October 2027, 6 a.m.
Initial price per 1 MWh: 440 CZK/Storage period
For additional information please contact: auction@mnd-es.cz
Ing. Josef Brůček Tel.: +420 775 877 182
Filip Červenka Tel.: +420 775 875 092